Beacon
Barracks
The redevelopment of Beacon Barracks included single living accommodation, regimental headquarters, mess building incorporating dining and leisure facilities, offices, technical workshops, sports, medical and dental centre facilities. In total, 25 new buildings were constructed and eight existing refurbished.

- Client Name
- Bovis
- Sector
- Defence
- Location
- Stafford
- Duration
- 65 weeks

Project
Overview
Our biggest challenge on site was creating a new service trench to military specifications. Due to the intricate details of the trench and buildability issues, this required considerable interaction with the design team and other contractors working on the site.
Our Works
Included
- RC foundations
- Floor and upper slabs
- Construction of grouted macadam access roads
- Plane and overlay of existing surfaces
- Multi-use service trench to MOD specification including recycled bed and surround
- External works including paving and landscaping
- Substructure slabs including insulation
- Surface and foul drainage
- Attenuation systems
- Balancing ponds

Related Services
Learn more about the services behind our projects and delivery.

Earthworks, Site Preparation & Enabling Works
We deliver earthworks and site preparation, including bulk earthworks, earthmoving, soil remediation, site clearance, ground stabilisation, temporary works and enabling works.

Substructure & Reinforced Concrete
We provide specialist substructure, reinforced concrete and foundation works, from concrete walls, columns and slabs to industrial pits, formwork, transfer slabs and pump houses.

Drainage
We deliver complete drainage solutions, from surface, storm and foul water drainage to attenuation systems, culverts, pumping chambers and SuDS.