22 weeks
New Walk Centre construction

Project
Overview

The scheme consisted of two buildings. The first, a five-storey office block, was constructed with a central lightwell. Adjacent to this is the second building which has retail units on the ground floor and four levels of residential flats above. These two buildings are linked by a large underground car park. Both buildings overlook New Walk Circle, an ideal public realm area to relax from the rush of city life.

From the outset we were under pressure from the very tight programme. With other trades running late we changed our sequence of works to ensure no time was lost which resulted in the project successfully being completed on time.

Our Works
Included

  • Piling attendance
  • High level pile cap
  • RC foundations
  • RC retaining walls
  • Ground floor slabs
  • Services
  • Drainage and connections
New Walk Centre construction work

Related Services

Learn more about the services behind our projects and delivery.

Earthworks, Site Preparation & Enabling Works

We deliver earthworks and site preparation, including bulk earthworks, earthmoving, soil remediation, site clearance, ground stabilisation, temporary works and enabling works.

Substructure & Reinforced Concrete

We provide specialist substructure, reinforced concrete and foundation works, from concrete walls, columns and slabs to industrial pits, formwork, transfer slabs and pump houses.

Drainage

We deliver complete drainage solutions, from surface, storm and foul water drainage to attenuation systems, culverts, pumping chambers and SuDS.