Highfield School

This project was for the construction of a replacement senior school and special school and was built whilst the existing school buildings were still in place.

Through detailed construction of a 3D model of proposed finished levels and the allocation of construction depths to each different area, our team was able to measure cut and fill requirements as the job progressed and stockpile material accordingly within the constraints of the live school site. This allowed for the effective use of any surplus material at the end of the project for completion of the sports pitch.

Details

Customer – Carillon

Duration – 108 weeks

Location – Wolverhampton

Our works included

  • Excavation of foundations
  • Pile caps
  • Drainage
  • Pile mats
  • Tubosider attenuation
  • Gabions
  • Floor slabs
  • External slab and block pavings
  • Tarmac roads and paths
  • Permeable paved car park and sub-base
  • Lime stabilisation works
  • Installation of street furniture
  • Construction of a curved concrete amphitheatre