Rugby Gateway is a 120-acre prime logistics site located at the heart of the distribution ‘golden triangle’, immediately adjacent to Junction 1 of the M6 motorway.

Rugby Gateway project
Client Name
Bowmer & Kirkland
Sector
Commercial
Location
Rugby
Duration
29 weeks
Rugby Gateway construction

Project
Overview

The foundations were excavated using a Trimble GPS 3D system which provides real-time information for monitoring avoidance zones and simultaneously collects as-built data as the machine cuts to grade.

With these capabilities, we were able to minimise waste and see precisely where earth was being moved on site. It also allowed us to keep a tighter control over safety as there was no need for a banksman to be near the machine or open excavation.

Our Works
Included

  • Foundations
  • Mass fill bases with mesh reinforcement
  • Storm and foul drainage
  • Attenuation system
  • Footways
  • External works including car park
  • BWIC external services
  • Yard slabs
Rugby Gateway construction work

Related Services

Learn more about the services behind our projects and delivery.

Earthworks, Site Preparation & Enabling Works

We deliver earthworks and site preparation, including bulk earthworks, earthmoving, soil remediation, site clearance, ground stabilisation, temporary works and enabling works.

Substructure & Reinforced Concrete

We provide specialist substructure, reinforced concrete and foundation works, from concrete walls, columns and slabs to industrial pits, formwork, transfer slabs and pump houses.

Drainage

We deliver complete drainage solutions, from surface, storm and foul water drainage to attenuation systems, culverts, pumping chambers and SuDS.