Stafford University
Student Village
A new student accommodation village for Staffordshire University spanning across 17,665m², providing 700 students with new homes away from home.

- Client Name
- Willmott Dixon
- Sector
- Education
- Location
- Staffordshire
- Duration
- 82 weeks

Project
Overview
The works included a new four-storey student accommodation arranged in cluster blocks and two town houses, an upgrade of the existing Clarence Cliff student accommodation and a new timber frames Student Village Hub.
The works required extensive re-modelling of the site to provide a series of stepped plateaus for the new accommodation, new storm and foul drainages connecting to existing outfalls, extensive vehicle circulation and several permanent ponds that are integrated into the overall Sustainable Urban Drainage System strategy.
Our Works
Included
- Drainage
- Services
- Sub structure foundation
- RC retaining walls to the hub
- Raft Slab finished to a high tolerance for the timber frame contractor
- Tobermore Secura Grande retaining walls to externals
- Kerbs, edgings and external paving

Related Services
Learn more about the services behind our projects and delivery.

Groundworks & External Works
We deliver comprehensive groundworks and external works, including excavation, foundations, piling, hard landscaping, kerbs, paving and external slabs.

Civil Engineering
We undertake a broad range of civil engineering works, including highways, S278 works, utility installations, road markings, sheet piling and retaining structures.

Drainage
We deliver complete drainage solutions, from surface, storm and foul water drainage to attenuation systems, culverts, pumping chambers and SuDS.
