Tesco Extra,
Swan Shopping Centre
This project to construct a new Tesco Extra store was part of a larger regeneration project for the Swan Shopping Centre in Yardley.

- Client Name
- Bowmer & Kirkland
- Sector
- Retail and Leisure
- Location
- Birmingham
- Duration
- 58 weeks

Project
Overview
A new loop road was constructed to divert traffic around the newly constructed thousand space car park.
Our Works
Included
- Pad foundations
- Underpinning existing bases
- 6m high retaining walls
- Nine lift pits
- Ground floor slabs
- Storm and foul drainage, and attenuation systems
- 20,000m2 permeable form pave Car Park
- Externals including service yard, block paving, footpaths, kerbs and recycling area
- Services

Related Services
Learn more about the services behind our projects and delivery.

Earthworks, Site Preparation & Enabling Works
We deliver earthworks and site preparation, including bulk earthworks, earthmoving, soil remediation, site clearance, ground stabilisation, temporary works and enabling works.

Substructure & Reinforced Concrete
We provide specialist substructure, reinforced concrete and foundation works, from concrete walls, columns and slabs to industrial pits, formwork, transfer slabs and pump houses.

Drainage
We deliver complete drainage solutions, from surface, storm and foul water drainage to attenuation systems, culverts, pumping chambers and SuDS.