Tesco Extra,
Swan Shopping Centre

This project to construct a new Tesco Extra store was part of a larger regeneration project for the Swan Shopping Centre in Yardley.

Client Name
Bowmer & Kirkland
Sector
Retail and Leisure
Location
Birmingham
Duration
58 weeks

Project
Overview

A new loop road was constructed to divert traffic around the newly constructed thousand space car park.

Our Works
Included

  • Pad foundations
  • Underpinning existing bases
  • 6m high retaining walls
  • Nine lift pits
  • Ground floor slabs
  • Storm and foul drainage, and attenuation systems
  • 20,000m2 permeable form pave Car Park
  • Externals including service yard, block paving, footpaths, kerbs and recycling area
  • Services

Related Services

Learn more about the services behind our projects and delivery.

Earthworks, Site Preparation & Enabling Works

We deliver earthworks and site preparation, including bulk earthworks, earthmoving, soil remediation, site clearance, ground stabilisation, temporary works and enabling works.

Substructure & Reinforced Concrete

We provide specialist substructure, reinforced concrete and foundation works, from concrete walls, columns and slabs to industrial pits, formwork, transfer slabs and pump houses.

Drainage

We deliver complete drainage solutions, from surface, storm and foul water drainage to attenuation systems, culverts, pumping chambers and SuDS.