The new 1500 place school and Sixth Form was constructed on the site of the existing school, modernising the buildings including a swimming pool and outdoor pitches.

Client Name
Bowmer & Kirkland
Sector
Education
Location
Coventry
Duration
50 weeks

Project
Overview

Delivered via the ‘School Rebuilding Programme’, the school was part of the DfE’s Modern Methods of Construction Framework and is net zero carbon in operation.

Our Works
Included

  • Earthworks
  • Piling mat
  • Substructure works
  • Floor slabs
  • External works
  • Retaining walls
  • Drainage
  • Services

Related Services

Learn more about the services behind our projects and delivery.

Groundworks & External Works

We deliver comprehensive groundworks and external works, including excavation, foundations, piling, hard landscaping, kerbs, paving and external slabs.

Civil Engineering

We undertake a broad range of civil engineering works, including highways, S278 works, utility installations, road markings, sheet piling and retaining structures.

Drainage

We deliver complete drainage solutions, from surface, storm and foul water drainage to attenuation systems, culverts, pumping chambers and SuDS.